Home/Epoxy Floors
Epoxy & Polyaspartic · Middle TN · N. Alabama · S. KentuckyIndustrial epoxy, polyaspartic, and urethane mortar systems specified to the chemical, mechanical, and thermal demands of the space — installed clean, cured fast, and built to last.
There is no universal floor coating. We pick the resin, build, and topcoat against your traffic, chemistry, temperature, and downtime budget — and write a system that lives up to it.
Self-priming, high-build epoxy systems for warehouse, manufacturing, and assembly floors. Color-matched, slip-rated, and ready for fork-traffic.
UV-stable, fast-cure topcoats over epoxy or as standalone systems. Open back to traffic in 24 hours — ideal for facilities that can't lose a weekend.
Heavy-duty, thermal-shock-resistant flooring for food & beverage, wash-down areas, and processing plants. Holds up to steam, hot water, and harsh chemistries.
Broadcast flake and quartz systems for showrooms, retail, lobbies, and high-end residential — durable surface, designer finish.
Flat, seamless pours for clean spaces and high-end commercial floors. Smooth, easy-to-clean, photogenic.
Existing floor failing? We assess, prep, and recoat — saving you the cost and downtime of a tear-out where it makes sense.
We start every epoxy specification with a short list of questions: What rolls on it? What spills on it? How hot does it get? When can we have the room? The answers point to the system, the build, and the topcoat — not the other way around.
If you don't know the answers yet, that's fine. Walking the space with you is part of how we earn the work.
| Demand | System |
|---|---|
| Heavy fork traffic | 1/8" troweled epoxy + urethane topcoat |
| Thermal shock / wash-down | Urethane cement mortar |
| Aggressive chemicals | Novolac epoxy / vinyl ester |
| UV-exposed exterior | Polyaspartic / aliphatic urethane |
| Showroom & retail | Self-leveling epoxy + flake |
| Fast turnaround | One-day polyaspartic system |
Need a static-controlled floor? See our ESD epoxy systems page — engineered to ANSI/ESD S20.20 and S7.1.
Tell us what the floor has to do. We'll come back with a system, a schedule, and a number.